Magenta Construction
6:47AM - 1:31PM (6 Hours 43 Minutes)
9:45AM
Alright, Ryan's computer is prepared, and he's talking with Vlad about some kind of password thing, but I'll have to finish up that conversation later. I'm gonna get everything ready to go to Troy's now and do that install, at least to get the switch up top fixed and the cameras working, and the box put in behind the wall. Maybe I'll hook up Ethernet to the TV with the converter because that's easy, and then try to access a list of things connected to the mesh, and disable the bell modem, and then hopefully disable the mesh as well, and get that set up. Maybe even run a line from the basement to the basement access point.
1:30PM
--- Transcription Unavailable ---
1:31PM
Alright, I'm done at Troy's. I installed the upstairs and prepared in the living room. I need to configure the switch, but right now I'm going to punch out, have a shower, go to the office, meet with Sam, and I have to do Alejandro's computer and give Ryan the surface.
Magenta Construction
2:44PM - 5:30PM (2 Hours 45 Minutes)
2:45PM
I got here a few minutes ago, I forgot to punch in.
2:45PM
Just adding some stuff into Hadoop.
4:49PM
I need to fix the whiteboard connection, it can't create the temporary file because it's not running in an administrative context, it's running in shared, so I have to use a temporary folder instead.